Major Projects
(Domestic-Ongoing )
(A) Detail Project Report, Tender Document and Project Management Consultancy services
- Survey, preparation of Detail Project Report, Tender Document and Project Management Consultancy for Railway Electrification of 46.5 Track Kilometres of Railway siding. Client Name: Steel Authority of India Limited Location: Bhillai
- Survey, preparation of Detail Project Report, Tender Document and Project Management Consultancy for Railway Electrification of 70 Track Kilometres of Railway siding including construction of 1 No. 132KV/25KV Traction Substation. Client Name: Tata Steel Plant Location: Kalinganagar
- Survey, preparation of Detail Project Report, Tender Document and Project Management Consultancy for Railway Electrification of 14 Track Kilometres of Railway siding including construction of switching post and supply of 4 wheeler tower wagon. Client Name: Rashtriya Ispat Nigam Limited Location: Vishakapatnam
(B) Project Management Consultancy services (PMC)
- Project Management Consultancy for Railway Electrification of 83 Track Kilometres of Railway siding including construction of 1 No. 132KV/25KV Traction Substation and 4 Nos. Switching posts. Client Name: Steel Authority of India Limited Location: Rourkela
(C) Project Management Consultancy services (PMC)
- Survey, Design, construction, installation and commissioning of Railway Electrification of 3.8 TKM including modification of existing OHE. It is a deposit work. Client Name: Steel Authority of India Limited and RMD (Joint venture) Location: Bolani
- Detailed engineering consultancy for Railway Electrification of 80 TKM Railway Track for the provision of 5th and 6th line on Central Railway from CSTM to Kurla. The work includes design of 3 Nos. Railway Traction substations and 5 Nos. switching posts. Client Name: Mumbai Rail Vikas Nigam Limited. Location: Mumbai
(E) Preliminary traffic cum Engineering Survey (PET)
- Preliminary traffic cum Engineering Survey for the construction of Dedicated Railway Freight corridors that includeds 2X25 KV Railway Electrification. The study is carried out in 4 nos. New corridors (1) North-South 2173 KM (Delhi-Chennai) (2) East-West Corridor 2000 KM (Kolkatta-Mumbai) (3) East Coast Corridor 1100 KM ( Khargpur-Vijaywada) (4) Southern Corridor 890 KM (Chennai-Goa)
(Domestic-Completed )
(A) Detailed Survey